MCEC
Videos |

Gala Venue seating in action |
Interleaved lift action during Gala seating changeover |
Hufcor operable walls – propaganda video with some good technical information
|
MCEC
Pictures |
Master control |

Main foyer |

Foyer looking across the Yarra |

Plenary main stage |

Main stage with flown screen (rollup screen between speaker arrays) |

Wireless AMX touch panel running DVD playback |

Main stairs to Level 1 – ubiquitous digital signage |

Plenary 3 line arrays and screen in position. |

Plenary 3 details of rollup screen and speaker cabinet flying |
|

Plenary 3 screen and line arrays |

Plenary vision control |

Plenary control room with audio and video control desks |

Operable walls being moved in to divide Plenary |

Meeting room racks in control room |

Meeting room racks in control room |

Meeting room racks in control room |

Lectern with cup holder and keyboard deployed |

Lectern |

Lectern |

Meeting room in long mode |

Banquet hall with both long and wide mode screens in place |

Banquet hall. |

Pre-function area outside Banquet Hall |

Pre-function area outside meeting rooms |

Meeting room with scenic windows and plasma screen instead of projection |

Main reception desk with rear-projected glass signage |

Foyer level entries to Plenary |

Gala seating system mechanicals |

Plenary 1 venue with modular stage decking in place |

Main stage platforms under construction |

18-inch Spiralift actuators under the Plenary main stage |
|
Port Augusta Courts |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|